- From the main menu bar, select Company Setup, then Project/Jobs.
- From the Projects dropdown, select the project to modify.
- Select the Report Data tab.
- Select the desired report from the drop down.
- Select the checkbox next to Current pay period is final certification.
- Select Save Data at the bottom of the page.
- Generate the report to verify the final certified payroll is reflected on the report.