How do I change a project code?

A project code can edited if it was incorrectly added to Points North Certified Payroll Reporting. Project codes cannot be edited if there is work data (hours worked) tied to the project.
  1. From the main menu bar, select Company Setup, then Project/Jobs.

  2. From the Projects dropdown, select the project to modify.

  3. Edit the Project Code, then select Save Project.

  4. A green Project details saved will appear at the lower left once the code has been changed.